No | Nama Peserta | K | SK | SB | B | A | T | ST | Alasan |
---|---|---|---|---|---|---|---|---|---|
1 | CV. TECH ENGINEERING Consultant - 03.054.188.2-816.000 | 93,24 | 93,24 | 79,1 | |||||
2 | CV. INTER PLANINDO - 66.007.282.8-816.000 | 65,47 | |||||||
3 | CV. BUTON EXPLORE CONSULTANT - 75.468.280.5-816.000 | 100,0 | 82,0 | ||||||
4 | CV.CIPTA LAPANDEWA CONSULTANT - 01.411.321.1-816.000 | 80,0 | 78,92 | ||||||
5 | KARYA CIPTA MANDIRI - 03.347.427.1-811.000 | 89,34 | 89,34 | ||||||
6 | KENCANA UTAMA - 81.891.307.1-816.000 | 43,77 | |||||||
7 | CV. DRAFT CONSULTANT - 84.102.069.6-816.000 | ||||||||
8 | CV.ANALISA KONSTRUKSI - 03.167.169.6-816.000 | ||||||||
9 | CV. BINTANG SURYA PRATAMA - 02.678.650.9-811.000 | ||||||||
10 | CV. KAISON KONSULTAN - 02.679.012.1-811.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian